NOTE: DESCA is a model which needs to be adapted to the circumstances of the individual project.
Download DESCA Horizon Europe 2.1 (lump sum / actual cost) with elucidations in PDF:
DESCA HE 2.1 with elucidations (PDF)
Download DESCA Horizon Europe 2.1 (lump sum / actual cost) in Word format:
DESCA HE 2.1 (Word)
Download DESCA HE AP 2.0 (incl. lump sum & actual cost subsections) with comments in Word format:
DESCA HE AP 2.0_August 2025